2018 New 12V UPS Li-ion Battery Charger for Wholesale

FOB Reference Price:Get Latest Price
$2.00 - $8.00 / Pieces | 100 Piece/Pieces (Min. Order)
Socket Standard:
EU/AU/UK/US
Lead Time:
Quantity(Pieces) 1 - 5 6 - 1000 >1000
Est. Time(days) 7 25 Negotiable
Report Suspicious Activity
Overview
Quick Details
Brand Name:
GVE
Model Number:
GC12-120100
Use:
Li-ion battery, mobile phone, electric toy
Type:
Electric
Place of Origin:
Guangdong, China
Item name:
12v ups li-ion battery charger
Color:
Black/White
Warranty:
3 years
OEM/ODM:
Acceptable
Input voltage range:
AC100-240v/50-60hz
Output voltage:
12V
Output power:
12W
AC Plug:
EU/US/UK/AU/CN
Material:
Plastic
Certification:
CE/GS/TUV/RoHS/FCC/SAA/CCC/KC
Supply Ability
Supply Ability:
800000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
PE Bag+Clapboard+Outer Carton or according to customer's requirements
Port
Any port in China
Lead Time :
Quantity(Pieces) 1 - 5 6 - 1000 >1000
Est. Time(days) 7 25 To be negotiated
Video Description

2018 New 12V UPS Li-ion Battery Charger for Wholesale

Product Description

Product Parameter

GVE, ASSURED GOOD POWER:
1)Light weight, miniaturization and use of convenience;
2)Lower cost, high reliability
3)Universal input/output inf.: 1) input AC110 -240V, 50/60HZ, output DC 12V 1A

4)Certification: we can offer

CCC/CE/FCC/GS/RoHS certificates and so on

5)O/P: high accuracy, low noise

6)Environment: operation temperature: a)0°C-35°C, 5%-95%RH;  

b)storage temperature: -20°C-80°C, 5%-95%RH;

Protection:
1)Short circuit protection
2)Over voltage protection
3)Over current protection
4)Thermal shutdown capability
Features: Safety and reliability

Electrical: 

Dielectric Withstand:                4,000V AC Primary-Secondary

Leakage Current:                   0.25mA @ 2 Pin/3.5mA @3 Pin

Efficiency:                        Energy Star Level V & ERP Stage 2 Certified

EMI Conduction & Radiation:        Compliance to EN55022 Class B

Harmonic Current:                 Compliance to EN61000-3-2

MTBF:                          50,000 Calculated Hours at 25°C , by Telcordia SR-332

 

Product Show

 

 

 

 

 

 

The first stage of constant current charging, LED indicator light turns red, charging to the rated voltage; constant voltage charge into the second stage, the current gradually decreased, when the charging current reaches the current turn lights, LED lights turn green, then the electric quantity is 90% -95%, at the same time, current will become slowly continues to charge until full.

 

Please note: Various wall plugs for different countries are available. Similarly, regular size of DC connector is 5.5*2.5mm, other sizes and usb port are also available.

 

Packaging & Shipping

Detailed Packing

1. PE Bag + Clapboard + Outer Carton

2. According to customer’s requirements

 

Shipping Details

1.By air

Your order for 12v ups li-ion battery charger will be delivered by DHL, FEDEX, UPS, TNT, or other International Express. It’s up to you to choose your suitable express company. It normally takes 3-7 days to arrive at your destination. Surcharge will be charged if your destination is remote area.

2. By sea

Shipments will be arranged under FOB conditions.

 

Our Services

1. Reply your enquiry in 24 hours via email (8: 00am ~5: 30pm, Monday to Saturday (UTC+8).

2. Experienced staffs answer all your questions in professional and fluent English.

3. OEM or ODM is welcome. We have strong R&D team here to customize power products you need.

4. Feasible solutions can be provided to our customer by well-trained and professional engineers and staffs.

5. Good after-sale service offered, please get back if you have any question.

Product Application

 

 

Company Information

Our Mission: To provide customers with 101% assured good power!

¤ 25,000m² factory rolls out 2500,000 units every month

¤ Own mold department with 900 workers

¤ R&D specialists average 22 years industry expertise

¤ Each power supply are strictly license certification standard production

¤ Product repair rate is less than 0.2‰

¤ 18 series and over 1,000 items for your selection 

¤ Orders shipped in as fast as 15 days; NO MOQ 

 

 

 

FAQ

Q1. How to get your samples?

- Usually you can get one or two pcs for free but you should pay for the delivery charge from our factory to your office, you can inform us your courier paid account such as DHL, Fedex, TNT or UPS.

 

Q2. What is your terms and payment terms?

- Our terms is T/T or CASH. Usual payment terms is T/T 30% as deposit, T/T 70% before shipment.

 

Q3.  Do you inspect the finished products?

- Yes. Each step of production and finished products will be carried out inspection strictly by our QC department before shipping.

 

Q4.  How do you ship the finished products?

- By sea.

 

 

We have built up an R&D team to develop customized power products according to customers' requirements. Please send inquiry to us, we will give you more technical information.

 

If you want to see more products, please visit our website: http://fsgve.en.alibaba.com/ 

Perhaps you want to know more about our company, please click here: Company Profile 

Contact Us

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like